Installation conditions and survey table repair installation conditions:
2018-04-09
The net height of H6.2 series plant should be more than 6 meters, the spacing of support columns should be greater than 20% of the diameter of the fan to be installed, and the roof structure should be allowed to bear more than 155 kg.
The net height of the H8.2 series plant should be 4-7 meters, the spacing of the support columns should be greater than 20% of the diameter of the fan to be installed, and the roof structure should be allowed to bear more than 120 kg.
The distance between the installation position of the control box and the installation position of the fan is preferably less than 30 meters, and the buyer is responsible for connecting the 380/220 volt, 50Hz, 1.1 kW motor operation power cable to the control box, and the seller is responsible for the wiring between the control box and the fan.
MORE NEWS
2020/08/07
Permanent magnet industrial large ceiling fan: the effect of logistics large fan
2020/08/04
Permanent magnet industrial large ceiling fan: factors affecting the speed of logistics large fan
2020/07/28


Shenzhen Honyton Machinery Co., Ltd
Share with friends
Hotline:
86-13823760931
Add:
Building A1, Xinjianxing Science and Technology Industrial Park, No. 3333 Guangqiao Avenue, Guangming New District, Shenzhen
QQ:1283464599(8:00-22:00 online) SKYPE:honytonfan (Online from 8:00 to 18:00 on weekdays)
Copyright © 2023 Shenzhen Honyton Machinery Co., Ltd All rights reserved.
Contact us / FAQ / Messages